The Dev Team And Skills For Justice Leapfrog Developmet TimescaleCase Study: Wimbledon Roof

Fairfield Control Systems, back in 2005 set out on a 4 year project to automate the new Wimbledon Centre Court Roof. The system had to control 10 trusses, each weighing 100 tonnes and 77m long, running on two parallel tracks. The 8 minute operation (controlled to a 0.1mm resolution) required a solution to process and monitor 4000 I/O readings every second.

Fairfield Control Systems used PCS to assist their own development team on how to manage and control such a large volume of data.

PCS arranged a number of workshops, where our development team were able to guide Fairfield Control Systems on how the structure of the SQL database should be designed.

What Is The Dev Team

A team of highly skilled and experienced developers with over 18 years' experience in system design and development.

Find out more about the dev team

Development Services

Simplify Your Operations

Leapfrog Your Development Timescale

Optimising Your Business

Case Studies

Renault After Sales
Using the Dev Team, Renault have introduced a UK wide dealership portal

Ceva Optimisation
PCS integrate our parts ordering web application into Ceva operations

More Case Studies